“Meta is on track to begin producing the first chips in September. The report states that at least one chip design sailed through the testing phase in just six weeks.”
→ Read the source episode
Meta begins production of custom AI chips in September 2026
Meta will deploy 7 GW of compute capacity in 2026 and 14 GW in 2027.
MiniMax will release M3 Pro model as soon as Q3 2026
Meta will design a new chip every six months starting in 2027.
Leo predicts GPT-6 will launch within about a month, possibly in late July 2026.
SpaceX/Cursor model release could come as soon as Wednesday (2026-07-09)
Grok 4.5 will be released today (2026-07-08 or 2026-07-09)
Summaries are ours; the quote is a verbatim transcript excerpt. Our resolution criteria are editorial and disputable. How this works.